
Illustrative service visual
Installation · 26N6Z2130
Complete Re-Installation at New Site (1.0 Ton)
Fitting of previously used unit at new premises with flaring, vacuuming, and testing.
₹1,92018% GST extra · Nos.
Availability, site conditions, additional work and final terms are confirmed before acceptance.
- SKU
- 26N6Z2130
- Category
- Installation
- Capacity / size
- 1.0 Ton
- Warranty
- 30 days
- Unit
- Nos.
- Tax treatment
- 18% GST extra
Included in the service
- Mounting and alignment for the named unit
- Piping, vacuuming and commissioning as applicable
- Basic operating demonstration
Exclusions / additional work
- Spare parts unless explicitly named
- Major civil or electrical modification unless named
- Additional work approved after diagnosis
Service process
- Step 1: Airflow and load location survey with spirit level
- Step 2: Wall hole drilling with downward gradient for drain water
- Step 3: Flare torque wrench tightening and vacuum pump hold
- Step 4: 20-Minute temperature drop (Delta-T >= 8°C) test
Catalogue guide
Illustrated views explain the listed scope. They are not five independently photographed products or project sites.




Short catalogue overview
Illustrative catalogue animation with gentle original audio. Use the player volume control to adjust or mute.
Before you book or order
Confirm compatibility, exact item, coverage and final scope with our team. Listed warranty: 30 days.